Posts

Showing posts with the label EMD

Electro Motive Division Builder List

Image
Part I - EMD builder's list 1253-2999 (start of EMD production to 1946)  

EMD NW2 Phase Guide and Builder List

Image
  Atlantic Coast Line NW2 605, location, date and photographer unknown. Scanned from a 2 1/4 x 3 1/4 positive owned by Digital Rail Artist. This is a Phase 1a unit built in May, 1942. EMD sold 1,145 of their 1,000 horsepower switchers, built between February, 1939 and December, 1949, when it was replaced by the 1,200 horsepower SW7 . This is a 40-page detailed look at the phases and builder list. Revised to March 20, 2022 at 8:41 a.m., Mountain Standard Time.

EMD GP20 Phase Guide and Builder's List

Image
  EMD's GP20 was cutting-edge technology in 1959 when the first unit was sold to the Western Pacific.  The builder was loathe to risk the sacrifice of its rock-solid engineering reputation on the altar of unproven technology.  Railroads, however, were having none of it. The horsepower race was well underway. Wealthy customers were already blazing new ground, EMD in tow or not. Union Pacific was happily buying General Electric gas turbines that dwarfed the power of the GP9/GP18. The railroad was also adding turbochargers to their existing GP9 fleet. Southern Pacific and the Denver & Rio Grande Western were importing complex and exotic diesel hydraulics from Germany that had unheard of adhesion and horsepower.   If that wasn't bad enough, General Electric was ready to introduce the 2500 horsepower U25B that had been long under development. Reluctantly, then, EMD introduced the SD24 and the GP20, unfortunately just as a severe recession was getting started.  No one at that mom

EMD SW7 Phase Guide and Builder's List

Image
  EMD replaced the 1,000 horsepower NW2 with the 1,200 horsepower SW7 in October, 1949. The SW7 continued to be built until it too was replaced by the SW9 in November, 1950. There was some overlap in production, until January, 1951. This was a popular locomotive, and EMD could not keep up with demand. Southern Pacific wanted to place significant orders but had to settle for just four units for the Cotton Belt because of long lead times. Here's the link to the .pdf

EMD SW600 Phase Guide and Builder List

Image
 EMD's SW600 was the six-hundred horsepower successor to the SW1. Three new models were introduced in 1954 - the SW600, SW900, and SW1200. EMD built 1,056 of their 1200-horsepower SW1200 model. The SW900, at 900 horsepower, sold reasonably well at 372. The customer base for that model was industry and a few Class I roads with light-duty branch line applications. But the little SW600? Just 15 units for 13 different customers with no repeat orders. Six hundred horsepower units were a niche market by this time. Long gone were the robust sales of the SW1. Customers were few, mostly oil refiners, chemical plants, coal-fired electrical power plants, and rarely, a steel producer.  The only Class I customer was Chicago & North Western, buying just two units. By the time the 645-powered switchers were introduced, EMD could no longer justify including a six-hundred horsepower model because the margins were too low. Here's a link to the .pdf.

EMD NW2 Phases and Builder List

Image
Work is largely complete on this study, here's a link to the study as it stands. Proofreading and some added photos and it's done - Revised to March 20, 2022 at 8:30 a.m. Mountain Standard Time